Renovating Town Office

Adrien Gagnon with Cobra Contracting operates a radial mitre saw outside the Redwater Town Office on April 21 during renovations. The concrete sidewalk at this main entrance will be modified for wheelchair accessibility. The Town office is scheduled to be open to the public in late April.